Jamison completed the south wall at the front of the campus, rebuilding some areas and then repointing it 100%. A “Mast Climber” was also brought in to access the 104 foot tall circular structure, in order to repoint the brick smoke stack. Support bands requested by the University were installed to create added stability.
Many other smaller projects at different locations on the campus were performed by Jamison crewmen, including brick and stone pointing, drainage systems and concrete work.